The works included a Wickes branch totaling 30,000 sq ft, a Travis Perkins branch totaling 15,000 sq ft and a 150 m access roadway built to adoptable standards serving a further development plot.
Highways approval was required for access to the roadway. Extensive ground remediation measures were required to unlock the plot for development.
£2.6 million
31 weeks