Through working closely with the design team and the local water authority, we reduced the overall build cost by £51,000. This was achieved by reducing the on-site water attenuation by demonstrating that the cleared site once positively drained; therefore allowing for a reduction in the flow rates stipulated on the planning approval.
£1.4 million
29 weeks