The project started with the demolition of the former Pfizer site, adjacent to the main Havant London railway line. Goodrich managed the BAPA applications in relation to the proximity to the rail line.
The new build has a curved roof, created using the CA Roofing Griffon System which negates the need for a barrel vault roof. This resulted in no additional cost being added to the project whilst creating an aesthetically pleasing roof design.
£4.8 million
30 weeks