Airkix Skydiving Tunnel, Basingstoke

Design and construction of an indoor skydining tunnel, coffee shop and drive thru

Project Overview

Design and construction of an indoor skydiving tunnel, coffee shop and drive thru

Construction on site was not straight forward with a 20-metre high return air tower, a service deck up at 20 metres with four 10 tonne fans and a 5 metre deep basement to accommodate the airflow for the wind tunnel.

The project required purpose made wind tunnel components to be shipped over from America in 20 steel shipping containers.

Project Value:

£6 million

Project Duration:

30 weeks